The Lower House Secretary General meets with a group
of Indian Engineers while Dr. Hosseini the Urban Ministry Deputy was also presented.

In the meeting while the
House’s secretariat some chairmen had been presented the engineers of the CPWD
group gave information about the preformed activities such as difficulties in the
new National Assembly building repairing and designing to the House’s general
Secretary.
They criticized lack of
their access to marble stone while the needed for up- build the National
Assembly’s new building.
In continuation of the
meeting about triggering the IT system, installation of camera in the new
building, how to observe the vardancy of the garden and the rest of issue had
been discussed and made requirement decision.
Meanwhile, The Lower House
secretary General expressed his happiness from his meeting whit Indian engineers;
he requested them besides the repairing of the National Assembly take into
consideration the repairing of an other building for TV broadcasting.
In addition, the Secretary
General asked the CPWD engineers till completes the repairing of National
Assembly building up- to the end of 2013.
At the end of the meeting,
the Indian engineers with considered the House’s Secretary General statements
and demands, assured for achieving these demands they would take serious steps.
Translation by Storai Sadaat, March 25, 2012v